It’s a whole new look with the insulation and siding going up.
Roof
The roof is going on, of course with the clouds threatening rain š
Framing the building
The metal frame starts to take shape!
The pad is poured!
The pad is poured and being vibrated to get the air out prior to finishing it.
Prepping for the pad
After everything is in it’s place, it’s time to prep for the concrete pad.
Pipes, wires and anything else
Making everything work takes a lot of wiring, pipes, tubes and tanks!
Foundation walls
More cribbing for the foundation walls
Base cured/water line
The base has cured and the water line is dug in
Cribbing
Cribbing the footingĀ of the foundation for cement
Starting to dig
Collection tankĀ holes and foundation edge
Building arrival
The building has arrived and is waiting to be unloaded
Lot clearing
We started clearing and leveling the lot on June 10, 2014